![Terminal C Canopy and Upper Deck](/images/APlus%20Jobs/Terminal%20C%20Canopy.jpg#joomlaImage://local-images/APlus Jobs/Terminal C Canopy.jpg?width=1000&height=562)
Terminal C Canopy and Upper Deck
Project Overview:
At a cost of $67 Million, the Terminal C canopy and upper deck was expanded to provide weather projection, and increate capacity. The expansion also included new elevators and solar panels.
Services Provided:
Deformation Monitoring, Control Surveys