![Leonard P. Zakim Bunker Hill Memorial Bridge](/images/APlus%20Jobs/ZB1.jpg#joomlaImage://local-images/APlus Jobs/ZB1.jpg?width=1920&height=1080)
Leonard P. Zakim Bunker Hill Memorial Bridge
Project Overview:
As part of Boston's Big Dig project the cable-stayed bridge was completed in 2003. The bridge spans 1,400 ft across the Charles River.
Services Provided:
Construction Layout and as-builts