![Charlton LNG Tank](/images/APlus%20Jobs/Charlston%20LNG.jpg#joomlaImage://local-images/APlus Jobs/Charlston LNG.jpg?width=1200&height=1187)
Charlton LNG Tank
Project Overview:
This tank was part of a $100 million liquified gas facility, including gas interconnection pipeline and a gas meter station. The tank can handle 250,000 gallons per day and has a 2 million gallon full containment, LNG storage tank, and a truck location station with 4 bays.
Services Provided:
Construction Layout